7000 Series 2RU
Overview This guide is intended for appropriately trained service personnel and technicians who need to install some Arista Network data center switches. Receiving and Inspecting the Equipment When you receive the switch. Inspect the shipping container for external damage. If you believe any part of your shipment is damaged, please save the packaging. Your carrier may need to verify them. If the box was not damaged during shipping, carefully unpack it. Please be careful not to throw away the accessories that are included in the same box as the main unit. Please check the packing list and ensure you have received all items listed. Compare your order with the packing list. The parts list contains a list of components included in the switch. Installation Process The following tasks are required to install and use the switch. Select and prepare the installation site (site selection). Gather the installation tools listed (tools and parts required for installation). In...